New Richmond Bridge – Stage 1

Location
Richmond, New South Wales
Value
$41 million
Client
Transport for NSW
Status
In progress
20250804_104824
BMD are delivering the first stage of the New Richmond Bridge project.

This includes two new roundabouts, realigned road, demolition of the existing bridge, construction of a new bridge and relocating utilities. These works will enhance the Hawkesbury-Nepean Valley Flood Evacuation Network to improve traffic flow and safety during flood events.

Located near BMD’s current works at RAAF Richmond and Richmond System Wastewater Upgrade, this project benefits from BMD’s local knowledge – helping to minimise disruption to the community and road users throughout delivery.

20250804_102315
20250805_113951
20250804_104824
20250805_114306

Project scope

Upgrading two intersections with new roundabouts on The Driftway at Blacktown Road and Londonderry Road

Demolition, realignment and reinstatement of existing road

The demolition of an existing bridge and the construction of a new bridge over Rickaby’s Creek to improve flood resilience

Relocation of utilities and a bus stop to support new infrastructure